Design, Build, Finance, Operate, and Transfer (DBFOT) project to construct a pipeline that will transport 500–1000 MMSCF/day of natural gas from the Risha field in eastern Jordan to the Arab Gas Pipeline through the interconnection point at Al-Khanasr.